Friday, August 26, 2011

ROAD CONSTRUCTION: Disney Bridge Replacement

The Disney Bridge will be closed from
9/12 through 10/20
May open earlier as work is completed

-All vehicles must be removed from south side of Disney Bridge prior to 7am on 9/12.
-No vehicle access south of bridge after 7am on 9/12
-Parking will be available for residents north of Disney Bridge along road shoulder and behind “Bridge Out Ahead” barricade during construction period.
-Pedestrian and utility vehicle access available for southside resident access during bridge construction.
-Resident vehicles will be issued “NPS Authorized Vehicle” windshield placards to alleviate public parking beyond barricade. More details to follow or inquire at Ranger Station.